Great views from above at Jackson Court, Coatbridge!

Dem-Master Demolition is currently deconstructing the South Tower of the Block.

Our remote-controlled Brokk Demolition Robot is breaking out floors and walls. The materials are then carefully sorted by our smaller plant. We have dust suppression in place, dampening materials to minimise environmental impact.

The team are loading the arisings into a crane-tipping skip, which is then lowered to ground level for recycling. Clear communication and teamwork are crucial here to ensure this process runs safely and smoothly.

In the coming months, we'll be mobilising our Ultra-High-Reach Demolition Rig to begin the mechanical demolition of the remaining structure.

Health, Safety, and the Environment are always at the heart of what we do.

Demolition Deconstruction HighReachDemolition Demolitioninsafehands Safety Coatbridge Sustainability Recycling